12 more RFID lanes open on PLUS Expressway
The North-South Expressway has 12 more RFID lanes at toll plazas in Setia Alam, Subang, Jalan Duta, Putra Mahkota, Kajang, Kubang Semang, Sungai Besi, Shah Alam, Sungai Buloh, Rawang Selatan and Penang Bridge. – The Malaysian Insight file pic, March 25, 2023.
Works Minister Alexander Nanta Linggi said the lanes were originally scheduled to be completed in mid-April. “I was also given an assurance that this RFID system will always be in the best condition. However, I also expect cooperation from RFID users on the PLUS expressway to always use the same RFID lane or payment mode when entering and exiting the toll plaza.
Malaysia Latest News, Malaysia Headlines
Similar News:You can also read news stories similar to this one that we have collected from other news sources.
Penang Bridge, BKE to trial open toll in September | The Malaysian InsightPLUS COO says motorists will be able to use debit and credit cards in RFID lanes.
Read more »
Plaza tol lebuh raya PLUS kini dilengkapi 12 lorong RFIDMenteri Kerja Raya, Datuk Seri Alexander Nanta Linggi berkata, kerja-kerja menambah lorong RFID di Lebuh raya Utara-Selatan kini sudah selesai lebih awal daripada perancangan asal selepas diumumkan Januari awal tahun ini.
Read more »
PLUS to conduct open payment system trial run at Penang Bridge and BKE in Sept, to use RFID lanes - paultan.orgHighway concessionaire PLUS Malaysia has announced that it will conduct a trial run for the implementation of its open toll payment system at the Penang Bridge and Butterworth-Kulim Expressway (BKE) in September, Bernama reports. This …
Read more »
PLUS to conduct open toll payment system trial run at Penang Bridge, BKE in SeptemberGEORGE TOWN: PLUS Malaysia Berhad (PLUS) will conduct a trial run for the implementation of its open toll payment system using credit and debit cards at the Penang Bridge and Butterworth-Kulim Expressway (BKE) in September.
Read more »
Jambatan Pulau Pinang, BKE antara lokasi pembayaran tol terbuka PLUSPLUS akan bekerjasama dengan Lembaga Lebuhraya Malaysia (LLM) dalam merealisasikan matlamat tersebut menjelang September ini. butterworth
Read more »
PLUS to conduct open toll payment system trial run at Penang Bridge, BKE in SeptPLUS chief operating officer Datuk Zakaria Ahmad Zabidi said they will work with the Malaysia Highway Authority (LLM) to implement the system. theSun thesundaily PLUS PenangBridge ButterworthKulimExpressway LLM
Read more »