PLUS to conduct open payment system trial run at Penang Bridge and BKE in Sept, to use RFID lanes - paultan.org

Malaysia News News

PLUS to conduct open payment system trial run at Penang Bridge and BKE in Sept, to use RFID lanes - paultan.org
Malaysia Latest News,Malaysia Headlines
  • 📰 paultan
  • ⏱ Reading Time:
  • 13 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 9%
  • Publisher: 51%

PLUS to conduct open payment system trial run at Penang Bridge and BKE in Sept, to use RFID lanes

for toll collection by September. The five locations are the Sungai Besi Expressway , Ampang-Kuala Lumpur Elevated Highway , New Pantai Expressway , Guthrie Corridor Expressway and Penang Bridge.

“PLUS welcomes the statement by the works minister about the implementation of the open toll payment system, especially allowing motorists to use debit and credit cards on several highways, including the Penang Bridge,” he said in a statement.

We have summarized this news so that you can read it quickly. If you are interested in the news, you can read the full text here. Read more:

paultan /  🏆 22. in MY

Malaysia Latest News, Malaysia Headlines

Similar News:You can also read news stories similar to this one that we have collected from other news sources.

PLUS to conduct open toll payment system trial run at Penang Bridge, BKE in SeptemberPLUS to conduct open toll payment system trial run at Penang Bridge, BKE in SeptemberGEORGE TOWN: PLUS Malaysia Berhad (PLUS) will conduct a trial run for the implementation of its open toll payment system using credit and debit cards at the Penang Bridge and Butterworth-Kulim Expressway (BKE) in September.
Read more »

PLUS to conduct open toll payment system trial run at Penang Bridge, BKE in SeptPLUS to conduct open toll payment system trial run at Penang Bridge, BKE in SeptPLUS chief operating officer Datuk Zakaria Ahmad Zabidi said they will work with the Malaysia Highway Authority (LLM) to implement the system. theSun thesundaily PLUS PenangBridge ButterworthKulimExpressway LLM
Read more »

Penang Bridge, BKE to trial open toll in September | The Malaysian InsightPenang Bridge, BKE to trial open toll in September | The Malaysian InsightPLUS COO says motorists will be able to use debit and credit cards in RFID lanes.
Read more »

Jambatan Pulau Pinang, BKE antara lokasi pembayaran tol terbuka PLUSJambatan Pulau Pinang, BKE antara lokasi pembayaran tol terbuka PLUSPLUS akan bekerjasama dengan Lembaga Lebuhraya Malaysia (LLM) dalam merealisasikan matlamat tersebut menjelang September ini. butterworth
Read more »



Render Time: 2025-03-01 06:51:12