Section 5A: Raub Bypass to save you hours of travel time

Malaysia News News

Section 5A: Raub Bypass to save you hours of travel time
Malaysia Latest News,Malaysia Headlines
  • 📰 theSundaily
  • ⏱ Reading Time:
  • 36 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 18%
  • Publisher: 51%

The remaining 2.6 kilometers are expected to be completed in June 2024.

Travelling may get a whole lot quicker as a part of the Lingkaran Tengah Utama Expressway, Section 5A: Raub Bypass, was opened to public on March 8.stated that the highway segment will save travel time from the East Coast Expressway to Kuala Lipis without passing through the towns of Raub and Bentong.

Travelers will be able to save two hours of travelling time and instead would take just 30 minutes with the new road. “We expect to reduce the risk of road accidents too because the road junction that will be opened will be equipped with traffic lights,“ said the Works Minister Datuk Seri Alexander Nanta Linggi, as reported by

Furthermore, it is anticipated that the new road would save travelers money and ease traffic on the current Jalan Persekutuan, particularly during rush hours, vacation seasons, and school breaks. Additionally, Section 5A: Raub Bypass is 9.6 km long as a whole. Along with the 600 metres on June 25 last year, the total length of the route that has been opened so far is 7km,

We have summarized this news so that you can read it quickly. If you are interested in the news, you can read the full text here. Read more:

theSundaily /  🏆 25. in MY

Malaysia Latest News, Malaysia Headlines



Render Time: 2025-02-15 09:34:56